Waferpedia

Comparison ledger

0020 17484 PartversusSDP 570 VMS In Line

Applied Materials 0020 17484 Part, Ulvac SDP 570 VMS In Line, side by side. Every value shown is drawn from the cited encyclopedia entries.

Email
Side-by-side comparison of selected equipment models
Attribute
0020 17484 PartApplied Materials
OEMApplied MaterialsUlvac
CategoryDepositionDeposition
Wafer size——
Process node——
Introduced——
Production run——
Lifecycle——
Lifecycle milestones——
Control system——
Generation——
FamilyApplied Materials 0020 17484 PartUlvac SDP 570 VMS In Line
Specifications
ConfigurationBar, Cap Bank, Hdpcvd 300mm Ultima X[1]Elevator[2]
Sputter Method—(DC Magnetron Sputtering)[2]
Takt Time (Cycle Time)—2.5 min[2]
Loader / Unloader—Manual substrate Loading)[2]
Required Electric Power—3 phase, 220 V, 60 Hz, 615 kVA[2]
Substrate Material—Glass[2]
Required Floor Space—Approx. W 7000 × L 32,000 × H 3000 mm[2]
Target Attachment Method—Metal bonding to backing plate[2]
Vacuum conditions—Preheat Chamber: ≤ 1 × 10⁻⁶ Torr; Sputtering Chamber: ≤ 1 × 10⁻⁶ Torr; Isolation Chamber: ≤ 1 × 10⁻⁶ Torr[2]
Pump down time—Preheat Chamber: Approx. 45 seconds from atmospheric pressure to 0.2 Torr; Removal Chamber: Approx. 45 seconds from atmospheric pressure to 0.2 Torr[2]
Sputtering pressure—8 × 10⁻⁴ to 8 × 10⁻³ Torr[2]
Thickness uniformity—2.5 min Film Thickness - 1100 Å[2]
Target size—144 mm × 690 mm × 6 mm[2]
Substrate on both sides—Yes[2]
Required compressed air—5–7 kg/cm²G; Approx. 105.0 Nm³/hr (average)[2]
Required N2 gas—0.5 kg/cm²G; Max: approx. 202 Nm³/hr; Normal: approx. 20.0 Nm³/hr[2]
Required process gases—Ar: 0.5 kg/cm²G, sccm; X: 0.5 kg/cm²G, sccm; Y: 0.5 kg/cm²G, sccm; Z: 0.5 kg/cm²G, sccm[2]
Required water cooling—2.5 kg/cm²G; Approx. 25.2 m³/hr; Water temperature: 15–30 °C[2]
Process chamber—Sputtering Chamber; Input Chamber -> Cathode Chamber -> Output Chamber[2]
Configuration elements—Elevator; Preparation Chamber; Isolation Room; Removal Chamber; Return Conveyor[2]
Temperature—2.5 kg/cm²G - Approx. 25.2 m³/hr - Water temperature: 15–30 °C[2]

Plan your fab

Building a Deposition process? Get a complete equipment list.

Open the fab equipment planner →
Sources (2)Every fact above is drawn from these public sources
  1. [1]inventory listing
  2. [2]inventory listing