Datacenter and AI Infrastructure Equipment

Every AI accelerator requires a manufacturing supply chain two steps upstream from the datacenter it will run in. The supply chain runs from fab tooling to component production to hardware assembly to datacenter installation. Most forecasters watch the last two steps. This page covers the first: the equipment that gates AI chip output before a single watt of power is drawn.

The three equipment categories most directly constraining AI accelerator supply are advanced packaging (CoWoS and HBM bonding), optical interconnect fabrication (silicon photonics for co-packaged optics), and power semiconductor process tools (GaN and SiC for datacenter power conversion). A surge in sourcing activity for these categories is among the earliest measurable signals that datacenter capacity is forming.

Equipment categories

Plan a datacenter-supply fab

The Build tool lets you pick an operation type (advanced packaging, silicon photonics, power semiconductors) and generate a full equipment plan from cited catalog entries, with budget tiers and phase timelines.

Open the Build tool